<NOTE> | This draft is an archived version. Click here to check the latest draft/version
Details
Details |
|
Proposal
1.0) Summary of the Problem Being Addressed by this Policy Proposal
The soft-landing policy ratified by the board on the 11/11/2011 describes how AFRINIC should manage allocations/assignments from the last /8. It defines 2 phases of IPv4 exhaustion. During phase 1, it sets the maximum to be /13 instead of /10 and in phase 2, the maximum to /22 and the minimum to /24. It makes no difference between existing LIRs or End-Users and new ones. The policy also does not impose IPv6 deployment.
IPv4 exhaustion in other regions combined with other factors has imposed huge pressure on the AFRINIC IPv4 pool with requests for large IPv4 blocks, with very little IPv6 deployment. The pressure on the AFRINIC IPv4 pool has led to some policy proposals to reserve some blocks for certain sub-communities.
2.0 Summary of How this Proposal Addresses the Problem
This policy proposal solves the problem described above by:
- Changing the value of the maximum allocations/assignment sizes during exhaustion phases 1 and 2.
- Reserving a dedicated block to facilitate IPv6 deployment.
3.0 The Proposal
3.1 Policy Manual section to be affected:
Section 5.4 of the CPM will be replaced as follows:
5.4 Soft Landing
This proposal describes how AFRINIC shall assign, allocate and manage IPv4 resources during the "Exhaustion Phase" which begins when AFRINIC first needs to assign or allocate IP addresses from the final /8 block (102/8) of IPv4 address space. The purpose of this policy is to ensure that address space is assigned and/or allocated in a manner that is acceptable to the AFRINIC community especially during this time of IPv4 exhaustion
In order to ensure a smooth transition to IPv6, AFRINIC's pool should be managed to provide members with address space after the IPv4 pool is depleted. This will help in maintaining IPv4 networks while deploying IPv6 networks - a practice that characterizes the transition period.
Enforcement of the “soft landing” policy begins when AFRINIC starts to allocate space from the final IANA allocated /8 (102/8).
5.4.1 The Final /8
The Final /8 block of IPv4 address space, or "Final /8", is the /8 block of IPv4 address space that has been allocated by the IANA to AFRINIC in terms of section 2.2c of the Global Policy for the Allocation of the Remaining IPv4 Address Space - http://www.icann.org/en/general/allocation-remaining-ipv4-space.html.
In this Soft-Landing policy section, “last /8” and “102/8” shall be used interchangeably.
5.4.2 Pre-Exhaustion Phase
The "Pre-Exhaustion phase" was the period during which AFRINIC allocated or assigned IPv4 addresses to LIRs and End Users using the section 5.0 of the policy manual and before the Exhaustion phase was triggered.
This phase ended when AFRINIC publicly announced (https://www.afrinic.net/en/library/news/2053-afrinic-enters-ipv4-exhaustion-phase-1) that the Exhaustion Phase has begun.
5.4.3 Exhaustion Phases
During the Exhaustion Phase, the following allocation and assignment policy will be used. This applies to both LIRs and End Users, and applies to all IPv4 address space allocated, assigned, or otherwise managed by AFRINIC during the transition to and after the beginning of the Exhaustion Phase, regardless of whether or not such IPv4 address space is a part of the Final /8.
During either of the phases below, all allocations and assignments of IPv4 space will be based on justified and demonstrated need.
The exhaustion phase will be divided into two parts:
5.4.3.1 Exhaustion Phase 1
5.4.3.1.1 During this phase, allocation/assignment of IPv4 address space will continue as in Pre-Exhaustion with the minimum set at /24, but the maximum will change from /10 to /18, subject to the provisions in 5.4.6
5.4.3.1.2 Allocations and assignments will be made from the final /8 or from any other IPv4 address space available to AFRINIC, until no more than a /11 of non-reserved space is available in the Final /8. At this point the exhaustion phase 2 will begin.
5.4.3.1.3 For the avoidance of doubt all applications in the process at this point will be evaluated as per the new policy.
5.4.3.2 Exhaustion Phase 2
Exhaustion Phase 2 will start when no more than a /11 of non-reserved space is available from the final /8. During this phase, the maximum allocation/assignment size will be /22, and the minimum shall remain at /24, subject to the provisions in 5.4.6
5.4.4 Eight (8) months planning window (Allocation and assignment period).
The allocation and assignment period shall be for 8 months. This will help to ensure that LIRs request only for resources they need in the short to medium term, and promote fairness in the equitable distribution of the last IPv4 address pool. This allocation/assignment period will remain the same throughout the life span of this policy.
5.4.5 Allocation Criteria
5.4.5.1 In order to receive IPv4 allocations or assignments during the Exhaustion Phase, the LIR or End User must meet IPv4 allocations or assignment policy requirements (by demonstrating and justifying the need for requested space) and must demonstrate to have efficiently used at least 90% of all previous allocations or assignments (including those made during both the Pre-Exhaustion and the Exhaustion Phase).
5.4.5.2 In the case of new LIRs or End Users (those that have no previous allocations or assignments prior to the Exhaustion phase), this requirement does not apply to their first allocation or assignment request.
5.4.5.3 AFRINIC resources are for the AFRINIC service region and any use outside the region should be solely in support of connectivity back to the AFRINIC region
5.4.6 Allowable Limits & Subsequence
5.4.6.1 When an organization requests additional IPv4 address space in both Phase 1 and Phase 2, such an organization’s total allocations/assignments must not exceed the maximum allowable prefix of /18 for Exhaustion Phase 1 and /22 for Exhaustion Phase 2.
5.4.6.2 Not withstanding 5.4.6.1, an organization that has received the maximum allowable prefix in each phase can only request for another round of allocation/assignment in the same phase (as per 5.4.6.1) after 24 calendar months waiting period.
5.4.7 IPv6 deployment reserve
A contiguous /12 IPv4 address block will be reserved out of the Final /8 to facilitate IPv6 deployment. When AFRINIC, can no longer meet any more requests for address space (from the Final /8 or from any other available address space), allocations and assignments from this block must be justified by needs for IPv4 addresses space to support IPv6 deployment. Examples of such needs include: [IPv4 addresses for Core DNS service providers’ dual stack DNS servers, 464XLAT translators or any other translators as defined by the IETF. This block will be subject to a maximum size allocation of /24.
5.4.7.1 AFRINIC staff will use their discretion when evaluating justifications and should use sparse allocation when possible within that /12 block.
5.4.7.2 In order to receive an allocation or assignment from the IPv6 deployment reserve:
5.4.7.2.1 The applicant may not have received resources under this policy in the preceding six (6) months;
5.4.7.2.2 The applicant must demonstrate that no other allocations or assignments will meet this need.
5.4.7.2.3 Exceptionally for this IPv6 reserve, Core DNS Service providers as defined in 5.6.4.4.2 will also include ICANN sanctioned African ccTLDs operating in the AFRINIC service region.
4. Acknowledgements
We thank authors of the Soft Landing–SD policy proposal and the community for their contributions.
5. Revision History
09 FEB 2016 |
AFPUB-2016-V4-001-DRAFT01 (Version 1.0) Version 1 posted to the rpd mailing list |
16 FEB 2016 |
AFPUB-2016-V4-001-DRAFT02 (Version 2.0): |
22 JUL 2016 |
AFPUB-2016-V4-001-DRAFT03 (Version 3.0): Maximum Allocation/Assignment size changed from /15 to /18 in phase 1 as per discussions at AFRINC-24 public policy meeting and follow on discussions on RPD. |
14 APR 2017 |
AFPUB-2016-V4-001-DRAFT04 (Version 4.0):
|
27 JUN 2017 |
AFPUB-2016-V4-001-DRAFT05 (Version 5.0):
|
6. References
Global Policy for the Allocation of the remaining IPv4 address pool:
http://www.AFRINIC.net/en/library/policies/135-afpub-2009-v4-001
Staff Assessment
Index: Staff Assessment Considerations
The following issues raised by AFRINIC staff in their assessment of Soft Landing BIS Version 4 have all been addressed in Version 5 as shown in the table:
Issue | Action |
|
Seems to be well defined in 5.4 |
|
N/A |
|
5.4 has been reworded to include omitted text. |
|
Done |
|
Both definitions have been removed |
|
New LIR/EU deleted from 5.4.1 and 5.4.5 reworded |
|
Done |
|
N/A |
|
Done |
|
Justified need for all phases added to 5.4.3 (and also in 5.4.5) |
|
Minimum adjusted to /24 |
|
Clarified in 5.4.3.2 |
|
N/A |
|
“Subject to the provisions of 5.4.6” has been added to both phases. |
|
Leave to staff. The old /12 can be carried over as the same reservation. |
|
Done |
|
N/A |
|
N/A |
STAFF ASSESSMENT for AFPUB-2016-V4-001-DRAFT05: IPv4 Soft Landing BIS (v5)
Proposal | AFPUB-2016-V4-001-DRAFT05 |
Title | IPv4 Soft Landing BIS (v5) |
URL | https://www.afrinic.net/fr/community/policy-development/policy-proposals/2153-ipv4-soft-landing-bis |
Assessed | 24th August 2017 |
1. Staff Understanding of the Proposal
- Complete replacement for the current IPv4 Soft Landing policy (replaces entire CPM 5.4)
- Makes resource provisions for new LIRs and End-Users, something lacking in current CPM 5.4.
- Creates a reserved & dedicated (IPv4 /12) block for companies needing IPv4 space to support IPv6 deployment.
- Introduces new values for the maximum allocation/assignment sizes as follows:
- Phase 1: Maximum /18, minimum /24
- Phase 2: Maximum /22, minimum /24
- Puts in place a 24-month waiting period for a member that has received the maximum allocation limit per phase. (A member must wait 24 months before requesting another allocation in case such a member has consumed their maximum allocation in any given phase).
2. Staff Comments
- The proposed new 5.4.3 that says "during either of the phases below, all allocations and assignments of IPv4 space will be based on justified and demonstrated need" could be further clarified to refer to "justified and demonstrated need according to policies in effect in the pre-exhaustion phase, in addition to restrictions that apply during the exhaustion phases".
- The proposed new 5.4.6.1 says "When an organization requests additional IPv4 address space in both Phase 1 and Phase 2, such an organization’s total allocations/assignments must not exceed the maximum allowable prefix of /18 for Exhaustion Phase 1 and /22 for Exhaustion Phase 2." This text refers to the organization’s total holdings, but we think the intention was to refer to the additional space that the organisation received during phase 1, or the additional space received during phase 2.
- The way the proposed new 5.4.6.2 overrides 5.4.6.1 is difficult to understand. We suggest the following text, which we hope expresses the authors' intent more clearly:
5.4.6.Allowable Limits 5.4.6.1 Within any 24-month period during Exhaustion Phase 1, an organisation may receive one or more allocations/assignments totaling the equivalent of a /18. 5.4.6.2 Within any 24-month period during Exhaustion Phase 2, an organisation may receive one or more allocations/assignments totaling the equivalent of a /22. |
- In 5.4.7, we suspect that the authors' intent is that the reservation under the existing 5.4.7.1 "for some future uses, as yet unforeseen" falls away, and is replaced by the new reservation under the proposed new 5.4.7 "to facilitate IPv6 deployment". In other words, there is only one /12 reservation, not two /12 reservations (one from the old Soft-Landing policy and one from this new policy proposal). If this is indeed the authors' intent, then we suggest using text similar to:
"A contiguous /12 IPv4 address block will be reserved out of the Final /8 to facilitate IPv6 deployment. For the avoidance of doubt, this replaces the /12 reservation for some future use that was present in a previous version of the IPv4 soft landing policy." |
- In 5.4.7, "This block will be subject to a maximum size allocation of /24" does not specify a minimum size. Please specify the minimum size. If the minimum is smaller than /24 then implementation will be much more difficult.
- In 5.4.7.2.3, please clarify whether ccTLDs are restricted to the two-letter country code TLDs, or whether IDN ccTLDs are alsoAccording to https://www.iana.org/domains/root/db and https://www.icann.org/resources/pages/fast-track-2012-02-25-en, ICANN uses the term "IDN ccTLD" for IDN TLDs associated with country names (such as “جزائر.” or "xn--lgbbat1ad8j" for Algeria).
3.Comments from Legal Adviser
None Observed
4.Implementation
4.1 Timeline & Impact
AFRINIC will take approximately 2 months to implement this proposal after ratification. (Implementation actions are listed in 4.2 below).
4.2 Implementation Requirements
- Codification of new minimum and maximum allocation sizes in MyAFRINIC and whois.
- Codification of "waiting period" into MyAFRINIC.
- Revision of Resource Request forms (in MyAFRINIC and NMRP).
- Updating of internal process documents.
- Updating CPM sec 5.4 as appropriate.